3,666
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UK1402 #04 Y:2014 | 04 | 2014 | Reduce space conditioning during non-working hours | $1,833 | - | |
| UK1402 #03 Y:2014 | 03 | 2014 | Maintain air filters by cleaning or replacement | $2,530 | $1,500 | |
| UK1402 #02 Y:2014 | 02 | 2014 | Install compressor air intakes in coolest locations | $1,696 | $1,000 | |
| UK1402 #01 Y:2014 | 01 | 2014 | Install compressor air intakes in coolest locations | $3,710 | $4,500 | |
| TT0134 #03 Y:2014 | 03 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $96,724 | $822 | |
| TT0134 #02 Y:2014 | 02 | 2014 | Use adjustable frequency drive or multiple speed motors on existing system | $36,133 | $17,000 | |
| TT0134 #01 Y:2014 | 01 | 2014 | Install compressor air intakes in coolest locations | $9,053 | $1,894 | |
| UD0904 #14 Y:2014 | 14 | 2014 | Separate and recycle scrap metal to foundry or for sale | $47,628 | $1,300 | |
| UD0904 #13 Y:2014 | 13 | 2014 | Use closed cycle process to minimize waste water production | $69,423 | $62,000 | |
| UD0904 #12 Y:2014 | 12 | 2014 | Use filtration, centrifuging to remove contaminants | $96,196 | $72,000 | |
| UD0904 #11 Y:2014 | 11 | 2014 | Use adjustable frequency drive or multiple speed motors on existing system | $2,786 | $10,400 | |
| UD0904 #10 Y:2014 | 10 | 2014 | Use optimum thickness insulation | $16,866 | $20,982 | |
| UD0904 #09 Y:2014 | 09 | 2014 | Turn off equipment during breaks, reduce operating time | $2,039 | - | |
| UD0904 #08 Y:2014 | 08 | 2014 | Use adjustable frequency drive or multiple speed motors on existing system | $66,236 | $75,700 | |
| UD0904 #07 Y:2014 | 07 | 2014 | Eliminate or reduce compressed air usage | $777 | $384 | |
| UD0904 #06 Y:2014 | 06 | 2014 | Reduce the pressure of compressed air to the minimum required | $6,892 | - | |
| UD0904 #05 Y:2014 | 05 | 2014 | Recover waste heat from equipment | $33,689 | $62,131 | |
| UD0904 #04 Y:2014 | 04 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $34,024 | $5,000 | |
| UD0904 #03 Y:2014 | 03 | 2014 | Install occupancy sensors | $3,359 | $450 | |
| UD0904 #02 Y:2014 | 02 | 2014 | Reduce space conditioning during non-working hours | $6,875 | - |