ITAC Assessment: TT0134
ITAC logo
ITAC Assessment: TT0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Fiberglass components
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 700,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,160
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $459,762 6,411,300
kWh
Electricity Demand $13,075 1,030
kW-mo/yr
Natural Gas $34,546 7,538
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $141,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,724

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $9,053 $1,894 $9,053
129,334
kWh
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $36,133 $17,000 $36,133
516,899
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $96,724 $822 $96,724
1,381,739
kWh
TOTAL RECOMMENDED $141,910 $19,716 $141,910
2,027,972
kWh
TOTAL IMPLEMENTED $96,724 $822 $96,724
1,381,739
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs