| Assessment Year | 2021 |
|---|---|
| Principal Product | Garage Doors |
| NAICS | 332321: Metal Window and Door Manufacturing |
| SIC | 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing |
| Sales Range | $100 M to 500M |
| # of Employees | 751 |
| Plant Area |
1,059,000
ft2
|
| Annual Production | 605,164
units
|
| Production Hrs. Annual | 5,375
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $385,358 | 10,671,235 |
kWh
|
$0.036 | |
| Electricity Demand | $56,952 | 7,263 |
kW-mo/yr
|
$7.84 | |
| Electricity Fees | $7,893 | - |
|
- | |
| Natural Gas | $70,094 | 23,565 |
MMBtu
|
$2.97 | |
| Waste Disposal Costs | |||||
| Water Usage | $11,969 | 1,361 |
Tgal
|
$8.79 | |
| Water Disposal | $12,964 | 1,361 |
Tgal
|
$9.52 | |
| TOTAL YEARLY COSTS | $545,230 | ||||
| RECOMMENDED SAVINGS* | $4,296 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $4,066 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6211: Conserve energy by efficient use of vending machines | $104 | - |
$80
2,225
kWh
|
$24
-
kW-mo/yr
|
|
| 02 | 2.6218: Turn off equipment when not in use | $844 | - |
$106
2,936
kWh
|
$738
-
kW-mo/yr
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,097 | $185 |
$2,084
57,901
kWh
|
$1,013
-
kW-mo/yr
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $126 | $504 |
$126
3,494
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $125 | $522 |
$84
2,338
kWh
|
$41
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $4,296 | $1,211 |
$2,480
68,894
kWh
|
$1,816
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $4,066 | $707 |
$2,274
63,175
kWh
|
$1,792
-
kW-mo/yr
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs