ITAC Assessment: MA0433
ITAC logo
ITAC Assessment: MA0433
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Plastic bottles and labeling
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 121
Plant Area 67,000
ft2
Annual Production 108,000,000
pieces
Production Hrs. Annual 8,280
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $281,087 4,725,381
kWh
Electricity Demand $74,395 7,986
kW-mo/yr
LPG $7,591 938
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,317

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings By-product Production Savings
01 4.114: Add/modify equipment to improve drying process $18,033 $25,200 $(-3,145.0)
(-52,462)
kWh
$(-662.0)
-
kW-mo/yr
$21,840
02 2.2614: Use cooling tower or economizer to replace chiller cooling $9,704 $5,262 $8,381
140,680
kWh
$1,323
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,317 $3,950 $3,317
55,979
kWh
- -
04 2.6231: Utilize controls to operate equipment only when needed $1,414 - $1,414
24,033
kWh
- -
05 2.6231: Utilize controls to operate equipment only when needed $1,135 - $1,135
19,050
kWh
- -
06 4.642: Install sensors to detect and avoid jams $2,000 $700 - - $2,000
07 4.611: Begin a practice of predictive / preventative maintenance $6,150 $1,200 - - $6,150
TOTAL RECOMMENDED $41,753 $36,312 $11,102
187,280
kWh
$661
-
kW-mo/yr
$29,990
TOTAL IMPLEMENTED $3,317 $3,950 $3,317
55,979
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs