ITAC Assessment: SF0143
ITAC logo
ITAC Assessment: SF0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Cheese
NAICS
n/a
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $10
M
to 50
M
# of Employees 162
Plant Area 130,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 7,896
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $752,487 16,400,059
kWh
Electricity Demand $317,718 28,922
kW-mo/yr
Natural Gas $598,016 163,973
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $117,119 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $102,231

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.1231: Establish burner maintenance schedule for boilers $3,365 - - - - $3,365
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,986 - $2,346
51,290
kWh
$640
-
kW-mo/yr
- -
03 2.3132: Recharge batteries on during off-peak demand periods $367 - - - $367 -
04 2.7134: Use photocell controls $6,026 $2,250 $4,744
103,458
kWh
$1,282
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $5,067 $4,684 $3,712
80,305
kWh
$1,355
-
kW-mo/yr
- -
06 2.5195: Change product design to reduce energy requirements $78,251 $99,600 $101,367
2,208,968
kWh
$36,877
-
kW-mo/yr
- $(-59,993.0)
-
MMBtu
07 2.4239: Eliminate or reduce compressed air usage $5,701 $9,000 $4,569
99,648
kWh
$1,132
-
kW-mo/yr
- -
08 2.2511: Insulate bare equipment $468 $1,138 - - - $468
-
MMBtu
09 2.7142: Utilize higher efficiency lamps and/or ballasts $14,201 $34,990 $10,279
223,916
kWh
$3,922
-
kW-mo/yr
- -
10 2.1311: Replace electrically-operated equipment with fossil fuel equipment $687 $2,174 $815
17,878
kWh
$148
-
kW-mo/yr
- $(-276.0)
-
MMBtu
TOTAL RECOMMENDED $117,119 $153,836 $127,832
2,785,463
kWh
$45,356
-
kW-mo/yr
$367 $(-56,436.0)
-
MMBtu
TOTAL IMPLEMENTED $102,231 $116,672 $116,738
2,543,669
kWh
$41,286
-
kW-mo/yr
$367 $(-56,160.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs