ITAC Assessment: RU0027
ITAC logo
ITAC Assessment: RU0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PRINTED LABELS & SEALS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 316
Plant Area
n/a
Annual Production 20,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,216 747,948
kWh
Natural Gas $33,620 6,006
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,702 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,617 $682 $4,617
59,203
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $409 $202 $409
5,569
kWh
- -
03 2.6232: Install set-back timers $8,562 - $8,562
117,233
kWh
- -
04 2.2614: Use cooling tower or economizer to replace chiller cooling $3,810 $3,104 $3,872
53,048
kWh
- $(-62.0)
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,692 $1,800 $1,692
21,688
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,612 $500 - $1,612
-
MMBtu
-
TOTAL RECOMMENDED $20,702 $6,288 $19,152
256,741
kWh
$1,612
-
MMBtu
$(-62.0)
TOTAL IMPLEMENTED $15,200 $1,384 $13,588
182,005
kWh
$1,612
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs