Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,652

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0810 #07 Y:2005 Install spectral reflectors / delamp $7,167 $14,160
GT0810 #06 Y:2005 Insulate bare equipment $7,399 $7,301
GT0810 #05 Y:2005 Utilize higher efficiency lamps and/or ballasts $7,562 $7,239
GT0810 #04 Y:2005 Eliminate or reduce compressed air usage $11,228 $6,378
GT0810 #03 Y:2005 Eliminate or reduce compressed air usage $26,359 $9,400
GT0810 #02 Y:2005 Recover and reuse waste material $20,000 -
GT0810 #01 Y:2005 Separate and recycle scrap metal to foundry or for sale $30,000 -
BD0292 #08 Y:2005 Reposition oven walls to reduce heated space $647 -
BD0292 #07 Y:2005 Burn a less expensive grade of fuel $1,500 $1,400
BD0292 #06 Y:2005 Convert combustion equipment to burn natural gas $1,915 $2,680
BD0292 #05 Y:2005 Heat water with exhaust heat $9,106 $17,512
BD0292 #04 Y:2005 Reposition oven walls to reduce heated space $11,542 $5,600
BD0292 #03 Y:2005 Use / purchase optimum sized compressor $13,205 $25,000
BD0292 #02 Y:2005 Reduce the pressure of compressed air to the minimum required $20,594 $7,360
BD0292 #01 Y:2005 Utilize higher efficiency lamps and/or ballasts $29,591 $36,320
AS0404 #06 Y:2005 Use most efficient type of electric motors $197 $97
AS0404 #05 Y:2005 Reduce the pressure of compressed air to the minimum required $4,106 $50
AS0404 #04 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $4,338 $3,000
AS0404 #03 Y:2005 Install / repair insulation on steam lines $6,521 $11,360
AS0404 #02 Y:2005 Utilize higher efficiency lamps and/or ballasts $14,578 $45,427