ITAC Assessment: AS0404
ITAC logo
ITAC Assessment: AS0404
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Grilles and registers
NAICS 332323: Ornamental and Architectural Metal Work Manufacturing
SIC 3446: Architectural and Ornamental Metal Work
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 140,000
ft2
Annual Production 13,700,000
pieces
Production Hrs. Annual 5,976
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $424,554 4,478,442
kWh
Natural Gas $26,987 3,228
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,690 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Product Savings
01 4.131: Modify process to reduce material use/cost $60,950 - - - $60,950
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,578 $45,427 $14,578
133,079
kWh
- -
03 2.2136: Install / repair insulation on steam lines $6,521 $11,360 - $6,521
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,338 $3,000 $4,338
45,665
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,106 $50 $4,106
43,225
kWh
- -
06 2.4133: Use most efficient type of electric motors $197 $97 $197
12,430
kWh
- -
TOTAL RECOMMENDED $90,690 $59,934 $23,219
234,399
kWh
$6,521
-
MMBtu
$60,950
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Product Savings