| Assessment Year | 2005 |
|---|---|
| Principal Product | Engine Valves |
| NAICS | 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing |
| SIC | 3592: Carburetors, Pistons, Piston Rings, and Valves |
| Sales Range | $50 M to 100M |
| # of Employees | 330 |
| Plant Area |
148,391
ft2
|
| Annual Production | 46,000,000
pieces
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $557,299 | 24,230,400 |
kWh
|
$0.023 |
| Electricity Demand | $372,908 | 39,984 |
kW-mo/yr
|
$9.33 |
| Electricity Fees | $402 | - |
|
- |
| Natural Gas | $417,296 | 43,536 |
MMBtu
|
$9.59 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $134,867 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,228 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $30,000 | - | - | - | - |
$30,000
-
lb
|
|
| 02 | 3.5311: Recover and reuse waste material | $20,000 | - | - | - | - |
$20,000
-
lb
|
|
| 03 | 2.4239: Eliminate or reduce compressed air usage | $26,359 | $9,400 |
$16,445
715,000
kWh
|
$9,914
-
kW-mo/yr
|
- | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $11,228 | $6,378 |
$7,005
304,560
kWh
|
$4,223
-
kW-mo/yr
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,562 | $7,239 |
$4,986
216,770
kWh
|
$2,576
-
kW-mo/yr
|
- | - | |
| 06 | 2.2511: Insulate bare equipment | $7,399 | $7,301 | - | - |
$7,399
-
MMBtu
|
- | |
| 07 | 2.7144: Install spectral reflectors / delamp | $7,167 | $14,160 |
$4,471
194,400
kWh
|
$2,696
-
kW-mo/yr
|
- | - | |
| 08 | 2.2531: Re-size charging openings or add movable cover or door | $25,152 | $62,500 |
$11,196
486,765
kWh
|
$13,956
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $134,867 | $106,978 |
$44,103
1,917,495
kWh
|
$33,365
-
kW-mo/yr
|
$7,399
-
MMBtu
|
$50,000
-
lb
|
||
| TOTAL IMPLEMENTED | $11,228 | $6,378 |
$7,005
304,560
kWh
|
$4,223
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||