ITAC Assessment: GT0810
ITAC logo
ITAC Assessment: GT0810
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Engine Valves
NAICS 336310: Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3592: Carburetors, Pistons, Piston Rings, and Valves
Sales Range $50
M
to 100
M
# of Employees 330
Plant Area 148,391
ft2
Annual Production 46,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $557,299 24,230,400
kWh
Electricity Demand $372,908 39,984
kW-mo/yr
Electricity Fees $402 -
Natural Gas $417,296 43,536
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $134,867 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,228

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 3.5248: Separate and recycle scrap metal to foundry or for sale $30,000 - - - - $30,000
-
lb
02 3.5311: Recover and reuse waste material $20,000 - - - - $20,000
-
lb
03 2.4239: Eliminate or reduce compressed air usage $26,359 $9,400 $16,445
715,000
kWh
$9,914
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $11,228 $6,378 $7,005
304,560
kWh
$4,223
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,562 $7,239 $4,986
216,770
kWh
$2,576
-
kW-mo/yr
- -
06 2.2511: Insulate bare equipment $7,399 $7,301 - - $7,399
-
MMBtu
-
07 2.7144: Install spectral reflectors / delamp $7,167 $14,160 $4,471
194,400
kWh
$2,696
-
kW-mo/yr
- -
08 2.2531: Re-size charging openings or add movable cover or door $25,152 $62,500 $11,196
486,765
kWh
$13,956
-
kW-mo/yr
- -
TOTAL RECOMMENDED $134,867 $106,978 $44,103
1,917,495
kWh
$33,365
-
kW-mo/yr
$7,399
-
MMBtu
$50,000
-
lb
TOTAL IMPLEMENTED $11,228 $6,378 $7,005
304,560
kWh
$4,223
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs