ITAC Assessment: UF0343
ITAC logo
ITAC Assessment: UF0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Lumber, Wooden Poles
NAICS 321114: Wood Preservation
SIC 2491: Wood Preserving
Sales Range $50
M
to 100
M
# of Employees 68
Plant Area 17,500
ft2
Annual Production 24,000,000
thousand feet
Production Hrs. Annual 2,470
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $181,220 3,391,890
kWh
Electricity Demand $37,917 5,482
kW-mo/yr
Wood $60,278 2,691
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $294,864 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $234,107

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Administrative Changes Savings
01 2.2135: Repair and eliminate steam leaks $10,952 $225 - - $10,952
-
MMBtu
-
02 2.2123: Insulate feedwater tank $1,477 $1,828 - - $1,477
-
MMBtu
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,420 - $872
15,857
kWh
$548
-
kW-mo/yr
- -
04 2.2135: Repair and eliminate steam leaks $4,592 $1,706 - - $4,592
-
MMBtu
-
05 4.652: Replace existing equipment with more suitable substitutes $172,708 $330,000 - - - $172,708
06 4.651: Install back-up equipment $26,182 $64,000 - - - $26,182
07 4.448: Install automatic part storage / retreval system $59,280 $260,000 - - - $59,280
08 4.652: Replace existing equipment with more suitable substitutes $13,200 $12,000 - - - $13,200
09 4.812: Apply for investment incentives $5,053 $60 - - - $5,053
TOTAL RECOMMENDED $294,864 $669,819 $872
15,857
kWh
$548
-
kW-mo/yr
$17,021
-
MMBtu
$276,423
TOTAL IMPLEMENTED $234,107 $407,991 $872
15,857
kWh
$548
-
kW-mo/yr
$15,544
-
MMBtu
$217,143
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs