Assessment Year | 2004 |
---|---|
Principal Product | Lumber, Wooden Poles |
NAICS | 321114: Wood Preservation |
SIC | 2491: Wood Preserving |
Sales Range | $50 M to 100M |
# of Employees | 68 |
Plant Area |
17,500
ft2
|
Annual Production | 24,000,000
thousand feet
|
Production Hrs. Annual | 2,470
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $181,220 | 3,391,890 |
kWh
|
$0.053 |
Electricity Demand | $37,917 | 5,482 |
kW-mo/yr
|
$6.92 |
Wood | $60,278 | 2,691 |
MMBtu
|
$22.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $294,864 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $234,107 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2135: Repair and eliminate steam leaks | $10,952 | $225 | - | - |
$10,952
-
MMBtu
|
- | |
02 | 2.2123: Insulate feedwater tank | $1,477 | $1,828 | - | - |
$1,477
-
MMBtu
|
- | |
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,420 | - |
$872
15,857
kWh
|
$548
-
kW-mo/yr
|
- | - | |
04 | 2.2135: Repair and eliminate steam leaks | $4,592 | $1,706 | - | - |
$4,592
-
MMBtu
|
- | |
05 | 4.652: Replace existing equipment with more suitable substitutes | $172,708 | $330,000 | - | - | - | $172,708 | |
06 | 4.651: Install back-up equipment | $26,182 | $64,000 | - | - | - | $26,182 | |
07 | 4.448: Install automatic part storage / retreval system | $59,280 | $260,000 | - | - | - | $59,280 | |
08 | 4.652: Replace existing equipment with more suitable substitutes | $13,200 | $12,000 | - | - | - | $13,200 | |
09 | 4.812: Apply for investment incentives | $5,053 | $60 | - | - | - | $5,053 | |
TOTAL RECOMMENDED | $294,864 | $669,819 |
$872
15,857
kWh
|
$548
-
kW-mo/yr
|
$17,021
-
MMBtu
|
$276,423 | ||
TOTAL IMPLEMENTED | $234,107 | $407,991 |
$872
15,857
kWh
|
$548
-
kW-mo/yr
|
$15,544
-
MMBtu
|
$217,143 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs