4,652
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0323 #09 Y:2005 | 09 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $613 | $250 | |
| WV0323 #08 Y:2005 | 08 | 2005 | Eliminate or reduce compressed air usage | $698 | $260 | |
| WV0323 #07 Y:2005 | 07 | 2005 | Use waste heat from hot flue gases to preheat | $869 | $990 | |
| WV0323 #06 Y:2005 | 06 | 2005 | Turn off equipment when not in use | $1,015 | - | |
| WV0323 #05 Y:2005 | 05 | 2005 | Install outside air damper / economizer on hvac unit | $1,033 | $1,200 | |
| WV0323 #04 Y:2005 | 04 | 2005 | Utilize higher efficiency lamps and/or ballasts | $1,232 | - | |
| WV0323 #03 Y:2005 | 03 | 2005 | Analyze flue gas for proper air/fuel ratio | $1,575 | $1,000 | |
| WV0323 #02 Y:2005 | 02 | 2005 | Turn off equipment when not in use | $3,842 | - | |
| WV0323 #01 Y:2005 | 01 | 2005 | Insulate bare equipment | $12,908 | $363 | |
| LM0103 #08 Y:2005 | 08 | 2005 | Develop standard procedures to improve internal yields | $440,650 | $1,500 | |
| LM0103 #07 Y:2005 | 07 | 2005 | Develop standard operating procedures | $4,950 | $1,500 | |
| LM0103 #06 Y:2005 | 06 | 2005 | Repair or replace steam traps | $17,630 | $4,000 | |
| LM0103 #05 Y:2005 | 05 | 2005 | Install / repair insulation on steam lines | $2,159 | $550 | |
| LM0103 #04 Y:2005 | 04 | 2005 | Utilize higher efficiency lamps and/or ballasts | $49,470 | $72,000 | |
| LM0103 #03 Y:2005 | 03 | 2005 | Reduce the pressure of compressed air to the minimum required | $2,520 | - | |
| LM0103 #02 Y:2005 | 02 | 2005 | Eliminate leaks in inert gas and compressed air lines/ valves | $11,585 | $175 | |
| LM0103 #01 Y:2005 | 01 | 2005 | Use most efficient type of electric motors | $26,190 | $5,596 | |
| AS0406 #06 Y:2005 | 06 | 2005 | Reduce the pressure of compressed air to the minimum required | $10,848 | $1,000 | |
| AS0406 #05 Y:2005 | 05 | 2005 | Install / repair insulation on steam lines | $20,625 | $11,478 | |
| AS0406 #04 Y:2005 | 04 | 2005 | Use / purchase optimum sized compressor | $21,234 | $10,000 |