Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,237

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0027 #05 Y:1991 Eliminate leaks in inert gas and compressed air lines/ valves $1,912 $1,500
AS0027 #04 Y:1991 Reduce the pressure of compressed air to the minimum required $895 $1,200
AS0027 #03 Y:1991 Utilize higher efficiency lamps and/or ballasts $820 $3,312
AS0027 #02 Y:1991 Utilize higher efficiency lamps and/or ballasts $300 $141
AS0027 #01 Y:1991 Reduce ventilation air $4,948 -
AM0125 #09 Y:1991 Utilize higher efficiency lamps and/or ballasts $63 $51
AM0125 #08 Y:1991 Reduce illumination to minimum necessary levels $330 $190
AM0125 #07 Y:1991 Reduce illumination to minimum necessary levels $170 $90
AM0125 #06 Y:1991 Turn off equipment during breaks, reduce operating time $390 -
AM0125 #05 Y:1991 Utilize higher efficiency lamps and/or ballasts $1,230 $2,095
AM0125 #04 Y:1991 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,640 -
AM0125 #03 Y:1991 Eliminate leaks in inert gas and compressed air lines/ valves $3,970 $1,450
AM0125 #02 Y:1991 Use demand controller or load shedder $9,000 $12,500
AM0125 #01 Y:1991 Shift from daytime to nighttime operation $8,400 $6,000
AM0124 #07 Y:1991 Turn off equipment when not in use $300 $405
AM0124 #06 Y:1991 Utilize higher efficiency lamps and/or ballasts $135 -
AM0124 #05 Y:1991 Reduce the pressure of compressed air to the minimum required $418 $753
AM0124 #04 Y:1991 Install set-back timers $575 -
AM0124 #03 Y:1991 Improve lubrication practices $715 -
AM0124 #02 Y:1991 Eliminate leaks in inert gas and compressed air lines/ valves $1,060 $600