ITAC Assessment: AM0124
ITAC logo
ITAC Assessment: AM0124
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ADHESIVES AND CAULKS
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $5
M
to 10
M
# of Employees 23
Plant Area
n/a
Annual Production 1,400,000
ton
Production Hrs. Annual 4,344
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,363 1,048,359
kWh
Natural Gas $14,777 3,448
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,757 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $554 $845 $554
9,965
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,060 $600 $1,060
43,962
kWh
-
03 2.4312: Improve lubrication practices $715 - $715
13,775
kWh
-
04 2.6232: Install set-back timers $575 - $575
10,844
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $418 $753 $418
4,689
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $135 - $95
1,172
kWh
$40
07 2.6218: Turn off equipment when not in use $300 $405 $300
12,309
kWh
-
TOTAL RECOMMENDED $3,757 $2,603 $3,717
96,716
kWh
$40
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs