ITAC Assessment: AS0027
ITAC logo
ITAC Assessment: AS0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product WOOD CABINETS AND DOORS
NAICS
n/a
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,900
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,841 477,140
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,875 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,875

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7314: Reduce ventilation air $4,948 - $4,948
48,359
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $300 $141 $300
2,931
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $820 $3,312 $820
7,913
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $895 $1,200 $895
8,792
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,912 $1,500 $1,912
18,757
kWh
TOTAL RECOMMENDED $8,875 $6,153 $8,875
86,752
kWh
TOTAL IMPLEMENTED $8,875 $6,153 $8,875
86,752
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs