4,204
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WI0471 #03 Y:2004 | 03 | 2004 | Recover waste heat from equipment | $1,338 | $800 | |
| WI0471 #02 Y:2004 | 02 | 2004 | Replace existing equipment with more suitable substitutes | $5,108 | $59,785 | |
| WI0471 #01 Y:2004 | 01 | 2004 | Utilize higher efficiency lamps and/or ballasts | $7,303 | $15,076 | |
| WI0470 #08 Y:2004 | 08 | 2004 | Reschedule plant operations or reduce load to avoid peaks | $579 | - | |
| WI0470 #07 Y:2004 | 07 | 2004 | Modify refrigeration system to operate at a lower pressure | $1,075 | $4,000 | |
| WI0470 #06 Y:2004 | 06 | 2004 | Eliminate or reduce compressed air usage | $1,293 | - | |
| WI0470 #05 Y:2004 | 05 | 2004 | Install occupancy sensors | $1,484 | $896 | |
| WI0470 #04 Y:2004 | 04 | 2004 | Use adjustable frequency drive or multiple speed motors on existing system | $2,353 | $5,780 | |
| WI0470 #03 Y:2004 | 03 | 2004 | Lower temperature during the winter season and vice-versa | $4,832 | - | |
| WI0470 #02 Y:2004 | 02 | 2004 | Reduce air conditioning load by evaporating water from roof | $4,976 | $28,750 | |
| WI0470 #01 Y:2004 | 01 | 2004 | Utilize higher efficiency lamps and/or ballasts | $14,014 | $26,070 | |
| WI0468 #09 Y:2004 | 09 | 2004 | Use most efficient type of electric motors | $824 | $1,600 | |
| WI0468 #08 Y:2004 | 08 | 2004 | Lower temperature during the winter season and vice-versa | $2,932 | $360 | |
| WI0468 #07 Y:2004 | 07 | 2004 | Install compressor air intakes in coolest locations | $5,043 | $1,280 | |
| WI0468 #06 Y:2004 | 06 | 2004 | Replace city water with recycled water via cooling tower | $14,113 | $10,500 | |
| WI0468 #05 Y:2004 | 05 | 2004 | Use waste heat from hot flue gases to preheat | $9,209 | $16,500 | |
| WI0468 #04 Y:2004 | 04 | 2004 | Use waste heat from hot flue gases to preheat | $16,655 | $13,500 | |
| WI0468 #03 Y:2004 | 03 | 2004 | Install occupancy sensors | $673 | $150 | |
| WI0468 #02 Y:2004 | 02 | 2004 | Utilize higher efficiency lamps and/or ballasts | $52,024 | $103,390 | |
| WI0468 #01 Y:2004 | 01 | 2004 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $124,013 | $650,000 |