ITAC Assessment: WI0471
ITAC logo
ITAC Assessment: WI0471
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Control Valves
NAICS 334512: Automatic Environmental Control Manufacturing for Residential, Commercial, and Appliance Use
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 88,000
ft2
Annual Production 450,000
pieces
Production Hrs. Annual 5,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,523 2,102,920
kWh
Electricity Demand $53,559 5,085
kW-mo/yr
Electricity Fees $22,125 -
Natural Gas $22,492 2,878
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,523 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,068

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,303 $15,076 $4,248
124,362
kWh
$3,055
-
kW-mo/yr
-
02 4.652: Replace existing equipment with more suitable substitutes $5,108 $59,785 - - $5,108
-
MMBtu
03 2.2437: Recover waste heat from equipment $1,338 $800 $1,338
19,532
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $455 - $267
7,734
kWh
$188
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $319 $640 $175
5,196
kWh
$144
-
kW-mo/yr
-
TOTAL RECOMMENDED $14,523 $76,301 $6,028
156,824
kWh
$3,387
-
kW-mo/yr
$5,108
-
MMBtu
TOTAL IMPLEMENTED $14,068 $76,301 $5,761
149,090
kWh
$3,199
-
kW-mo/yr
$5,108
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs