| Assessment Year | 1994 |
|---|---|
| Principal Product | Gerotors |
| NAICS |
n/a
|
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 450 |
| Plant Area |
130,000
ft2
|
| Annual Production | 17,000,000
pieces
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,205,430 | 14,800,411 |
kWh
|
$0.081 |
| Natural Gas | $110,014 | 19,241 |
MMBtu
|
$5.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $136,522 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $42,534 | $50,000 |
$96,637
1,187,573
kWh
|
$(-54,103.0)
-
MMBtu
|
- | |
| 02 | 2.2515: Use optimum thickness insulation | $22,500 | $4,500 |
$22,500
277,843
kWh
|
- | - | |
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $35,300 | $70,000 |
$50,100
615,475
kWh
|
$(-14,800.0)
-
MMBtu
|
- | |
| 04 | 2.3212: Optimize plant power factor | $9,485 | $9,080 |
$9,485
-
kWh
|
- | - | |
| 05 | 3.4155: Meter waste water | $18,700 | $1,350 | - | - |
$18,700
-
Tgal
|
|
| 06 | 2.5123: Reduce fluid flow rates | $1,088 | $1,010 |
$1,088
13,482
kWh
|
- | - | |
| 07 | 2.2437: Recover waste heat from equipment | $6,915 | $30,000 | - |
$6,915
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $136,522 | $165,940 |
$179,810
2,094,373
kWh
|
$(-61,988.0)
-
MMBtu
|
$18,700
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs