| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| CO0553 #05 Y:2004 | 05 | 2004 | Utilize higher efficiency lamps and/or ballasts | $8,930 | $20,520 | |
| CO0553 #04 Y:2004 | 04 | 2004 | Install adequate dryers on air lines to eliminate blowdown | $2,260 | $8,700 | |
| CO0553 #03 Y:2004 | 03 | 2004 | Recover waste heat from equipment | $2,260 | $3,020 | |
| CO0553 #02 Y:2004 | 02 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,980 | $180 | |
| CO0553 #01 Y:2004 | 01 | 2004 | Upgrade controls on compressors | $5,190 | $20,000 | |
| BD0271 #13 Y:2004 | 13 | 2004 | Pay bills on time to avoid late fees | $9,163 | - | |
| BD0271 #12 Y:2004 | 12 | 2004 | Use closed cycle process to minimize waste water production | $1,425 | $500 | |
| BD0271 #11 Y:2004 | 11 | 2004 | Contract a wood pallet recycling company | $15,320 | $180 | |
| BD0271 #10 Y:2004 | 10 | 2004 | Use optimum thickness insulation | $278 | $434 | |
| BD0271 #09 Y:2004 | 09 | 2004 | Install occupancy sensors | $636 | $1,200 | |
| BD0271 #08 Y:2004 | 08 | 2004 | Reduce the pressure of compressed air to the minimum required | $2,621 | - | |
| BD0271 #07 Y:2004 | 07 | 2004 | Use synthetic lubricant | $3,573 | $450 | |
| BD0271 #06 Y:2004 | 06 | 2004 | Use synthetic lubricant | $3,573 | $320 | |
| BD0271 #05 Y:2004 | 05 | 2004 | Re-size charging openings or add movable cover or door | $5,880 | $20,000 | n/a |
| BD0271 #04 Y:2004 | 04 | 2004 | Replace air curtain doors with solid doors | $15,124 | $6,800 | |
| BD0271 #03 Y:2004 | 03 | 2004 | Optimize plant power factor | $18,512 | $44,500 | |
| BD0271 #02 Y:2004 | 02 | 2004 | Reschedule plant operations or reduce load to avoid peaks | $24,721 | $500 | |
| BD0271 #01 Y:2004 | 01 | 2004 | Eliminate leaks in inert gas and compressed air lines/ valves | $34,022 | $1,900 | |
| WV0307 #15 Y:2004 | 15 | 2004 | Eliminate practice of mixing waste streams | $75 | - | |
| WV0307 #14 Y:2004 | 14 | 2004 | Contract a wood pallet recycling company | $1,224 | $140 |