ITAC Assessment: WV0307
ITAC logo
ITAC Assessment: WV0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Grave Vaults
NAICS 339995: Burial Casket Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 300,000
ft2
Annual Production 54,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,969 3,608,747
kWh
Electricity Demand $103,884 9,995
kW-mo/yr
Electricity Fees $1,440 -
Natural Gas $249,026 43,591
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,088 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,237

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
01 2.7231: Use radiant heater for spot heating $33,386 $16,600 - - $33,386
-
MMBtu
- - -
02 3.4151: Minimize water usage $9,168 $7,800 - - $6,606
-
MMBtu
$2,562
-
Tgal
- -
03 2.2522: Isolate hot or cold equipment $3,113 $755 $(-19.0)
(-527)
kWh
$(-31.0)
-
kW-mo/yr
$3,163
-
MMBtu
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,891 $4,040 $1,083
30,165
kWh
$1,808
-
kW-mo/yr
- - - -
05 2.2414: Use waste heat from hot flue gases to preheat $2,255 $1,505 - - $2,255
-
MMBtu
- - -
06 2.4221: Install compressor air intakes in coolest locations $2,120 $600 $778
21,858
kWh
$1,342
-
kW-mo/yr
- - - -
07 2.2437: Recover waste heat from equipment $1,956 $1,260 - - $1,956
-
MMBtu
- - -
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,767 $53 $661
18,452
kWh
$1,106
-
kW-mo/yr
- - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,177 $210 $439
12,258
kWh
$738
-
kW-mo/yr
- - - -
10 2.4151: Develop a repair/replace policy $1,513 $271 $565
15,822
kWh
$948
-
kW-mo/yr
- - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $903 - $338
9,427
kWh
$565
-
kW-mo/yr
- - - -
12 2.2515: Use optimum thickness insulation $278 $380 - - $278
-
MMBtu
- - -
13 2.2511: Insulate bare equipment $262 $260 - - $262
-
MMBtu
- - -
14 3.5316: Contract a wood pallet recycling company $1,224 $140 - - - - $1,224
-
lb
-
15 3.1291: Eliminate practice of mixing waste streams $75 - - - - - - $75
-
lb
TOTAL RECOMMENDED $62,088 $33,874 $3,845
107,455
kWh
$6,476
-
kW-mo/yr
$47,906
-
MMBtu
$2,562
-
Tgal
$1,224
-
lb
$75
-
lb
TOTAL IMPLEMENTED $10,237 $2,069 $1,984
55,432
kWh
$3,326
-
kW-mo/yr
$3,703
-
MMBtu
- $1,224
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs