Assessment Year | 2004 |
---|---|
Principal Product | Grave Vaults |
NAICS | 339995: Burial Casket Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
300,000
ft2
|
Annual Production | 54,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $127,969 | 3,608,747 |
kWh
|
$0.035 |
Electricity Demand | $103,884 | 9,995 |
kW-mo/yr
|
$10.39 |
Electricity Fees | $1,440 | - |
|
- |
Natural Gas | $249,026 | 43,591 |
MMBtu
|
$5.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,088 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,237 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $33,386 | $16,600 | - | - |
$33,386
-
MMBtu
|
- | - | - | |
02 | 3.4151: Minimize water usage | $9,168 | $7,800 | - | - |
$6,606
-
MMBtu
|
$2,562
-
Tgal
|
- | - | |
03 | 2.2522: Isolate hot or cold equipment | $3,113 | $755 |
$(-19.0)
(-527)
kWh
|
$(-31.0)
-
kW-mo/yr
|
$3,163
-
MMBtu
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,891 | $4,040 |
$1,083
30,165
kWh
|
$1,808
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $2,255 | $1,505 | - | - |
$2,255
-
MMBtu
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,120 | $600 |
$778
21,858
kWh
|
$1,342
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.2437: Recover waste heat from equipment | $1,956 | $1,260 | - | - |
$1,956
-
MMBtu
|
- | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,767 | $53 |
$661
18,452
kWh
|
$1,106
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,177 | $210 |
$439
12,258
kWh
|
$738
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.4151: Develop a repair/replace policy | $1,513 | $271 |
$565
15,822
kWh
|
$948
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $903 | - |
$338
9,427
kWh
|
$565
-
kW-mo/yr
|
- | - | - | - | |
12 | 2.2515: Use optimum thickness insulation | $278 | $380 | - | - |
$278
-
MMBtu
|
- | - | - | |
13 | 2.2511: Insulate bare equipment | $262 | $260 | - | - |
$262
-
MMBtu
|
- | - | - | |
14 | 3.5316: Contract a wood pallet recycling company | $1,224 | $140 | - | - | - | - |
$1,224
-
lb
|
- | |
15 | 3.1291: Eliminate practice of mixing waste streams | $75 | - | - | - | - | - | - |
$75
-
lb
|
|
TOTAL RECOMMENDED | $62,088 | $33,874 |
$3,845
107,455
kWh
|
$6,476
-
kW-mo/yr
|
$47,906
-
MMBtu
|
$2,562
-
Tgal
|
$1,224
-
lb
|
$75
-
lb
|
||
TOTAL IMPLEMENTED | $10,237 | $2,069 |
$1,984
55,432
kWh
|
$3,326
-
kW-mo/yr
|
$3,703
-
MMBtu
|
- |
$1,224
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs