ITAC Assessment: UD0953
ITAC logo
ITAC Assessment: UD0953
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Electrical Boxes and Enclosures
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 222,000
ft2
Annual Production 228,400
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,353 3,100,440
kWh
Electricity Demand $179,985 8,412
kW-mo/yr
Electricity Fees $5,856 -
Natural Gas $8,034 1,038
MMBtu
Waste Disposal Costs
Water Usage $2,370 482,460
Tgal
Water Disposal $1,361 482
Tgal
TOTAL YEARLY COSTS $319,959
RECOMMENDED SAVINGS* $71,005 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $634

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Increase in Production Savings
01 2.2511: Insulate bare equipment $5,190 $348 $2,274
72,900
kWh
$2,916
-
kW-mo/yr
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,619 - $1,253
40,154
kWh
$1,606
-
kW-mo/yr
- - - $(-240.0) -
03 2.4221: Install compressor air intakes in coolest locations $577 $1,500 $253
8,098
kWh
$324
-
kW-mo/yr
- - - - -
04 2.3191: Use demand controller or load shedder $11,540 $25,000 - $11,540
-
kW-mo/yr
- - - - -
05 2.3192: Use fossil fuel powered generator during peak demand periods $10,677 $32,500 $9,360
300,000
kWh
$24,000
-
kW-mo/yr
- $(-22,683.0)
-
MMBtu
- - -
06 2.3212: Optimize plant power factor $3,158 $9,400 - - $3,158 - - - -
07 3.4116: Meter recycled water (to reduce sewer charges) $634 - - - - - $634
-
Tgal
- -
08 2.4133: Use most efficient type of electric motors $964 $5,300 $422
13,538
kWh
$542
-
kW-mo/yr
- - - - -
09 3.7121: Improve handling practices $35,646 $100,000 $(-155.0)
(-4,973)
kWh
$(-199.0)
-
kW-mo/yr
- - - - $36,000
TOTAL RECOMMENDED $71,005 $174,048 $13,407
429,717
kWh
$40,729
-
kW-mo/yr
$3,158 $(-22,683.0)
-
MMBtu
$634
-
Tgal
$(-240.0) $36,000
TOTAL IMPLEMENTED $634 - - - - - $634
-
Tgal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs