ITAC Assessment: SD0593
ITAC logo
ITAC Assessment: SD0593
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Composite Molds
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 410
Plant Area 120,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $871,838 7,802,766
kWh
Electricity Demand $668,772 46,725
kW-mo/yr
Electricity Fees $31,584 -
TOTAL YEARLY COSTS $1,572,194
RECOMMENDED SAVINGS* $66,974 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,483

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7135: Install occupancy sensors $32,448 $3,843 $32,448
290,494
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $29,043 $24,602 $23,815
213,186
kWh
$4,192
-
kW-mo/yr
$1,036
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,483 - $5,483
49,086
kWh
- -
TOTAL RECOMMENDED $66,974 $28,445 $61,746
552,766
kWh
$4,192
-
kW-mo/yr
$1,036
TOTAL IMPLEMENTED $5,483 - $5,483
49,086
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs