ITAC Assessment: MZ0315
ITAC logo
ITAC Assessment: MZ0315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Air filtration products
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 175,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,320
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $284,615 2,292,800
kWh
Natural Gas $39,229 590
MMBtu
Waste Disposal Costs
Water Usage $4,352 421
Tgal
TOTAL YEARLY COSTS $328,196
RECOMMENDED SAVINGS* $216,808 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,975

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7231: Use radiant heater for spot heating $15,635 $15,360 $(-1,607.0)
(-12,960)
kWh
$17,242
-
MMBtu
-
02 2.4239: Eliminate or reduce compressed air usage $2,404 $480 $2,404
19,385
kWh
- -
03 2.4239: Eliminate or reduce compressed air usage $2,771 $14,420 $2,771
22,350
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,247 $250 $2,247
18,128
kWh
- -
05 2.7135: Install occupancy sensors $3,818 $360 $3,818
30,793
kWh
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $16,735 $15,782 $(-326.0)
(-2,629)
kWh
$17,061
-
MMBtu
-
07 2.8114: Change rate schedules or other changes in utility service $34,981 $1,350 - - $34,981
08 2.9114: Use solar heat to make electricty $138,217 $836,000 $138,217
1,114,652
kWh
- -
TOTAL RECOMMENDED $216,808 $884,002 $147,524
1,189,719
kWh
$34,303
-
MMBtu
$34,981
TOTAL IMPLEMENTED $27,975 $31,292 $10,914
88,027
kWh
$17,061
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs