ITAC Assessment: UU0184
ITAC logo
ITAC Assessment: UU0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Bullets and Amunitions
NAICS 332992: Small Arms Ammunition Manufacturing
SIC 3482: Small Arms Ammunition
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 44,000
ft2
Annual Production 200,000,000
units
Production Hrs. Annual 5,900
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,087 989,679
kWh
Electricity Demand $54,605 3,560
kW-mo/yr
Electricity Fees $8,037 -
Natural Gas $9,356 1,354
MMBtu
Waste Disposal Costs
Water Disposal $14,000 10
Tgal
TOTAL YEARLY COSTS $122,085
RECOMMENDED SAVINGS* $34,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,453

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 3.3128: Utilize other methods to remove contaminants $26,453 $92,586 - - - $26,453
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,459 $2,700 $1,560
42,749
kWh
$898
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $2,375 $6,744 - - - $2,375
04 2.6218: Turn off equipment when not in use $1,530 $500 $1,530
41,928
kWh
- - -
05 2.7221: Lower temperature during the winter season and vice-versa $731 $2,000 $380
10,432
kWh
- $351
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $546 $550 $321
8,788
kWh
$225
-
kW-mo/yr
- -
TOTAL RECOMMENDED $34,094 $105,080 $3,791
103,896
kWh
$1,123
-
kW-mo/yr
$351
-
MMBtu
$28,828
TOTAL IMPLEMENTED $26,453 $92,586 - - - $26,453
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs