Assessment Year | 2012 |
---|---|
Principal Product | Low pressure gast turbine and compressor air foils |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | greater than $500 M |
# of Employees | 200 |
Plant Area |
125,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Vermont |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $588,414 | 8,097,772 |
kWh
|
$0.073 |
Electricity Demand | $271,971 | 16,324 |
kW-mo/yr
|
$16.66 |
Electricity Fees | $4,908 | - |
|
- |
LPG | $62,256 | 3,262 |
MMBtu
|
$19.09 |
Fuel Oil #2 | $196,960 | 8,652 |
MMBtu
|
$22.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $87,459 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,646 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $50,722 | $198,500 |
$(-2,568.0)
(-24,226)
kWh
|
$53,290
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,773 | $12,025 |
$10,773
148,193
kWh
|
- | |
03 | 2.4322: Use or replace with energy efficient substitutes | $10,724 | $45,500 |
$10,724
147,514
kWh
|
- | |
04 | 4.512: Condense operation into one building | $5,375 | $1,000 |
$5,375
97,937
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,857 | $9,000 |
$3,857
53,056
kWh
|
- | |
06 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,065 | $11,500 |
$3,065
42,155
kWh
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,306 | $4,500 |
$2,306
31,717
kWh
|
- | |
08 | 2.2511: Insulate bare equipment | $637 | $1,250 | - |
$637
-
MMBtu
|
|
TOTAL RECOMMENDED | $87,459 | $283,275 |
$33,532
496,346
kWh
|
$53,927
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,646 | $66,000 |
$17,646
242,725
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs