| Assessment Year | 1986 |
|---|---|
| Principal Product | CORRUG SHIPPING CONTAINE |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 149 |
| Plant Area |
n/a
|
| Annual Production | 595,000
thousand feet
|
| Production Hrs. Annual | 5,880
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $287,215 | 5,590,856 |
kWh
|
$0.051 |
| Natural Gas | $145,801 | 41,629 |
MMBtu
|
$3.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,436 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,881 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6232: Install set-back timers | $5,120 | $680 |
$5,120
99,648
kWh
|
- | |
| 02 | 2.4312: Improve lubrication practices | $5,482 | $2,700 |
$5,482
106,682
kWh
|
- | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $4,029 | $4,000 | - |
$4,029
-
MMBtu
|
|
| 05 | 2.2121: Increase amount of condensate returned | $1,050 | $1,500 | - |
$1,050
-
MMBtu
|
|
| 06 | 2.1123: Install automatic stack damper | $2,153 | $600 | - |
$2,153
-
MMBtu
|
|
| 08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,183 | $2,500 | - |
$1,183
-
MMBtu
|
|
| 09 | 2.2511: Insulate bare equipment | $1,183 | $1,000 | - |
$1,183
-
MMBtu
|
|
| 10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $708 | $30 |
$708
13,775
kWh
|
- | |
| 11 | 2.6121: Reduce hot water temperature to the minimum required | $375 | - | - |
$375
-
MMBtu
|
|
| 12 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $210 | $245 | - |
$210
-
MMBtu
|
|
| 13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,943 | $1,940 |
$1,943
37,808
kWh
|
- | |
| TOTAL RECOMMENDED | $23,436 | $15,195 |
$13,253
257,913
kWh
|
$10,183
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,881 | $6,865 |
$7,063
137,456
kWh
|
$2,818
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs