ITAC Assessment: OR0240
ITAC logo
ITAC Assessment: OR0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Alder Lumber
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 169,000
ft2
Annual Production 60,000,000
thousand feet
Production Hrs. Annual 5,512
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $612,004 18,391,559
kWh
Natural Gas $240,750 57,632
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,853 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,053

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $1,950 $7,729 $1,950
62,134
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $14,925 $57,725 $14,925
474,795
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $410 - $410
12,896
kWh
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $38,795 $99,195 $38,795
1,203,986
kWh
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,308 $15,000 $18,308
582,649
kWh
06 2.4224: Upgrade controls on compressors $2,403 $500 $2,403
76,495
kWh
07 2.3212: Optimize plant power factor $16,062 $20,000 $16,062
-
kWh
TOTAL RECOMMENDED $92,853 $200,149 $92,853
2,412,955
kWh
TOTAL IMPLEMENTED $59,053 $121,924 $59,053
1,848,769
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs