ITAC Assessment: NV0140
ITAC logo
ITAC Assessment: NV0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Wear Parts for Equipment & Machinery
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 20
Plant Area 25,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,184
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,647 417,644
kWh
Electricity Demand $15,846 2,437
kW-mo/yr
Electricity Fees $261 -
Natural Gas $683 81
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,056 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,349

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $110 $52 $62
879
kWh
$48
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,840 $800 $1,160
16,999
kWh
$676
-
kW-mo/yr
$4 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,509 $4,692 $1,043
16,999
kWh
$463
-
kW-mo/yr
$3 -
04 2.7241: Install outside air damper / economizer on hvac unit $556 $1,360 $309
4,982
kWh
$246
-
kW-mo/yr
$1 -
05 3.6192: Use a less expensive method of waste removal $2,041 - - - - $2,041
TOTAL RECOMMENDED $6,056 $6,904 $2,574
39,859
kWh
$1,433
-
kW-mo/yr
$8 $2,041
TOTAL IMPLEMENTED $3,349 $5,492 $2,203
33,998
kWh
$1,139
-
kW-mo/yr
$7 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs