| Assessment Year | 2004 |
|---|---|
| Principal Product | Custom industrial pumps, shafts |
| NAICS | 333911: Pump and Pumping Equipment Manufacturing |
| SIC | 3561: Pumps and Pumping Equipment |
| Sales Range | $100 M to 500M |
| # of Employees | 40 |
| Plant Area |
45,800
ft2
|
| Annual Production | 420
pieces
|
| Production Hrs. Annual | 4,992
hrs
|
| Location (State) | New Mexico |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $80,501 | 1,385,004 |
kWh
|
$0.058 |
| Electricity Demand | $6,168 | 4,458 |
kW-mo/yr
|
$1.38 |
| Electricity Fees | $29,777 | - |
|
- |
| Natural Gas | $16,056 | 2,166 |
MMBtu
|
$7.41 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,600 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,980 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4224: Upgrade controls on compressors | $5,190 | $20,000 |
$4,250
58,100
kWh
|
$940
-
kW-mo/yr
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,980 | $180 |
$2,650
36,100
kWh
|
$330
-
kW-mo/yr
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $2,260 | $3,020 | - | - |
$2,260
-
MMBtu
|
- | |
| 04 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $2,260 | $8,700 |
$1,730
23,600
kWh
|
$530
-
kW-mo/yr
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,930 | $20,520 |
$8,850
120,800
kWh
|
$1,110
-
kW-mo/yr
|
- | $(-1,030.0) | |
| 06 | 2.7243: Improve air circulation with destratification fans / other methods | $4,620 | $15,230 |
$(-680.0)
(-11,600)
kWh
|
$(-60.0)
-
kW-mo/yr
|
$5,360
-
MMBtu
|
- | |
| 07 | 2.7135: Install occupancy sensors | $360 | $520 |
$300
3,300
kWh
|
- |
$60
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $26,600 | $68,170 |
$17,100
230,300
kWh
|
$2,850
-
kW-mo/yr
|
$7,680
-
MMBtu
|
$(-1,030.0) | ||
| TOTAL IMPLEMENTED | $2,980 | $180 |
$2,650
36,100
kWh
|
$330
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs