ITAC Assessment: SD0450
ITAC logo
ITAC Assessment: SD0450
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Sauces
NAICS 311941: Mayonnaise, Dressing, and Other Prepared Sauce Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 75
Plant Area 104,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 4,125
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $268,301 3,381,798
kWh
Electricity Demand $171,590 10,225
kW-mo/yr
Electricity Fees $13,191 -
Natural Gas $212,321 43,219
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,536 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2163: Use minimum steam operating pressure $8,111 $200 - - $8,111
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,795 $200 $3,795
47,862
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,833 $1,900 $2,987
37,673
kWh
$1,846
-
kW-mo/yr
-
04 2.7134: Use photocell controls $1,297 $3,550 $1,297
16,359
kWh
- -
05 2.2449: Recover heat from exhausted steam, hot air or hot water $8,500 $25,000 - - $8,500
-
MMBtu
TOTAL RECOMMENDED $26,536 $30,850 $8,079
101,894
kWh
$1,846
-
kW-mo/yr
$16,611
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs