ITAC Assessment: SU0425
ITAC logo
ITAC Assessment: SU0425
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Postpress Trade Bindery
NAICS 323120: Support Activities for Printing
SIC 2789: Bookbinding and Related Work
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 120,000
ft2
Annual Production 2,325,180
lb
Production Hrs. Annual 2,210
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,749 1,254,518
kWh
Electricity Demand $72,123 4,383
kW-mo/yr
Electricity Fees $8,973 -
Natural Gas $18,200 2,919
MMBtu
TOTAL YEARLY COSTS $181,045
RECOMMENDED SAVINGS* $22,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,702

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $5,154 - - - - - $5,154
02 2.7122: Disconnect ballasts $204 - $86
1,326
kWh
$118
-
kW-mo/yr
- - -
03 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,946 $852 $1,946
29,941
kWh
- - - -
04 2.7314: Reduce ventilation air $5,242 $3,294 $1,065
16,386
kWh
- $4,177
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $506 $396 $251
3,854
kWh
$87
-
kW-mo/yr
- $73 $95
06 2.4322: Use or replace with energy efficient substitutes $2,344 $4,750 $715
10,998
kWh
$1,629
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $1,298 $2,828 $1,298
19,962
kWh
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $5,941 $13,422 $2,428
37,349
kWh
$3,337
-
kW-mo/yr
- $145 $31
TOTAL RECOMMENDED $22,635 $25,542 $7,789
119,816
kWh
$5,171
-
kW-mo/yr
$4,177
-
MMBtu
$218 $5,280
TOTAL IMPLEMENTED $7,702 $4,750 $801
12,324
kWh
$1,747
-
kW-mo/yr
- - $5,154
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs