3,237
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0119 #10 Y:1991 | 10 | 1991 | Utilize energy-efficient belts and other improved mechanisms | $3,296 | $14,125 | |
| OR0119 #09 Y:1991 | 09 | 1991 | Preheat boiler makeup water with waste process heat | $2,630 | $8,930 | |
| OR0119 #08 Y:1991 | 08 | 1991 | Use most efficient type of electric motors | $1,268 | $4,135 | |
| OR0119 #07 Y:1991 | 07 | 1991 | Reduce fluid flow rates | $5,381 | $12,545 | |
| OR0119 #06 Y:1991 | 06 | 1991 | Utilize higher efficiency lamps and/or ballasts | $1,080 | - | |
| OR0119 #05 Y:1991 | 05 | 1991 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,373 | $6,000 | |
| OR0119 #04 Y:1991 | 04 | 1991 | Optimize plant power factor | $13,571 | $12,150 | |
| OR0119 #03 Y:1991 | 03 | 1991 | Insulate feedwater tank | $553 | $496 | |
| OR0119 #02 Y:1991 | 02 | 1991 | Repair faulty insulation in furnaces, boilers, etc | $3,126 | $2,580 | |
| OR0119 #01 Y:1991 | 01 | 1991 | Analyze flue gas for proper air/fuel ratio | $30,780 | $600 | |
| OR0118 #06 Y:1991 | 06 | 1991 | Utilize higher efficiency lamps and/or ballasts | $312 | $1,177 | |
| OR0118 #05 Y:1991 | 05 | 1991 | Optimize plant power factor | $2,040 | $5,100 | |
| OR0118 #04 Y:1991 | 04 | 1991 | Use most efficient type of electric motors | $383 | $919 | |
| OR0118 #03 Y:1991 | 03 | 1991 | Insulate bare equipment | $3,367 | $3,124 | |
| OR0118 #02 Y:1991 | 02 | 1991 | Use separate switches on perimeter lighting which may be turned off when natural light is available | $2,838 | - | |
| OR0118 #01 Y:1991 | 01 | 1991 | Turn off equipment during breaks, reduce operating time | $1,432 | - | |
| OK0351 #04 Y:1991 | 04 | 1991 | Install timers and/or thermostats | $458 | $750 | |
| OK0351 #03 Y:1991 | 03 | 1991 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,637 | - | |
| OK0351 #02 Y:1991 | 02 | 1991 | Replace electrically-operated equipment with fossil fuel equipment | $15,053 | - | |
| OK0351 #01 Y:1991 | 01 | 1991 | Use plant owned transformers or lease transformers | $10,327 | $13,900 |