ITAC Assessment: OK0351
ITAC logo
ITAC Assessment: OK0351
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product POWDERED METAL PARTS
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,443 2,912,954
kWh
Natural Gas $17,220 2,565
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,475 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3511: Use plant owned transformers or lease transformers $10,327 $13,900 $10,327
-
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $15,053 - $40,294
881,887
kWh
$(-25,241.0)
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,637 - $1,737
53,341
kWh
- $(-100.0)
04 2.7261: Install timers and/or thermostats $458 $750 - $458
-
MMBtu
-
TOTAL RECOMMENDED $27,475 $14,650 $52,358
935,228
kWh
$(-24,783.0)
-
MMBtu
$(-100.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs