ITAC Assessment: OR0118
ITAC logo
ITAC Assessment: OR0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product INJECTION-MOLDED PLASTIC
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 147
Plant Area
n/a
Annual Production 3,800,000
lb
Production Hrs. Annual 6,600
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,817 5,375,440
kWh
Natural Gas $15,201 2,961
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,372 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,372

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $1,432 - $1,432
31,067
kWh
-
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $2,838 - $2,184
56,272
kWh
$654
03 2.2511: Insulate bare equipment $3,367 $3,124 $3,367
72,978
kWh
-
04 2.4133: Use most efficient type of electric motors $383 $919 $383
7,913
kWh
-
05 2.3212: Optimize plant power factor $2,040 $5,100 $2,040
-
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $312 $1,177 $312
4,982
kWh
-
TOTAL RECOMMENDED $10,372 $10,320 $9,718
173,212
kWh
$654
TOTAL IMPLEMENTED $10,372 $10,320 $9,718
173,212
kWh
$654
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs