ITAC Assessment: TN0433
ITAC logo
ITAC Assessment: TN0433
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product BASEBALL BATS
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 912,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,859 1,252,345
kWh
Natural Gas $36,986 8,528
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,552 $3,000 $5,552
75,029
kWh
02 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $11,102 $19,000 $11,102
46,307
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $152 $152 $152
2,052
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $802 $180 $802
10,844
kWh
05 2.4227: Use compressor air filters $629 $25 $629
8,499
kWh
06 2.8114: Change rate schedules or other changes in utility service $22,993 $75,000 $22,993
-
kWh
TOTAL RECOMMENDED $41,230 $97,357 $41,230
142,731
kWh
TOTAL IMPLEMENTED $41,230 $97,357 $41,230
142,731
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs