Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,015

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL0159 #05 Y:1996 Recover and reuse waste material $205 -
UL0159 #04 Y:1996 Reduce the pressure of compressed air to the minimum required $746 $100
UL0159 #03 Y:1996 Install compressor air intakes in coolest locations $619 $87
UL0159 #02 Y:1996 Utilize higher efficiency lamps and/or ballasts $1,030 $3,060
UL0159 #01 Y:1996 Use most efficient type of electric motors $604 $1,240
UL0157 #08 Y:1996 Separate and recycle scrap metal to foundry or for sale $11,808 -
UL0157 #07 Y:1996 Separate and recycle scrap metal to foundry or for sale $1,714 $600
UL0157 #06 Y:1996 Contract a wood pallet recycling company $10,233 -
UL0157 #05 Y:1996 Install timers and/or thermostats $553 $200
UL0157 #04 Y:1996 Recover waste heat from equipment $330 $230
UL0157 #03 Y:1996 Install compressor air intakes in coolest locations $951 $87
UL0157 #02 Y:1996 Use most efficient type of electric motors $81 $2,160
UL0157 #01 Y:1996 Utilize higher efficiency lamps and/or ballasts $1,049 $1,157
UL0156 #07 Y:1996 Change procedures / equipment / operating conditions $2,136 -
UL0156 #06 Y:1996 Recycle casting sand $151 -
UL0156 #05 Y:1996 Install storm windows and doors $1,928 $2,000
UL0156 #04 Y:1996 Reduce the pressure of compressed air to the minimum required $694 $20
UL0156 #03 Y:1996 Install compressor air intakes in coolest locations $1,268 $100
UL0156 #02 Y:1996 Utilize higher efficiency lamps and/or ballasts $997 $3,214
UL0156 #01 Y:1996 Use most efficient type of electric motors $248 $9,180