| Assessment Year | 1996 |
|---|---|
| Principal Product | Ice Making Machines |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
40,000
ft2
|
| Annual Production | 406
pieces
|
| Production Hrs. Annual | 2,000
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $199,462 | 7,856,682 |
kWh
|
$0.025 |
| Electricity Demand | $175,563 | 24,936 |
kW-mo/yr
|
$7.04 |
| Natural Gas | $31,944 | 24,570 |
MMBtu
|
$1.30 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,422 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $248 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $248 | $9,180 |
$93
3,810
kWh
|
$155
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $997 | $3,214 |
$365
14,361
kWh
|
$632
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,268 | $100 |
$684
26,964
kWh
|
$584
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $694 | $20 |
$379
14,947
kWh
|
$315
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.7494: Install storm windows and doors | $1,928 | $2,000 |
$311
12,309
kWh
|
$196
-
kW-mo/yr
|
$1,421
-
MMBtu
|
- | - | |
| 06 | 3.5221: Recycle casting sand | $151 | - | - | - | - | - |
$151
-
lb
|
|
| 07 | 3.1191: Change procedures / equipment / operating conditions | $2,136 | - | - | - | - |
$2,136
-
gal
|
- | |
| TOTAL RECOMMENDED | $7,422 | $14,514 |
$1,832
72,391
kWh
|
$1,882
-
kW-mo/yr
|
$1,421
-
MMBtu
|
$2,136
-
gal
|
$151
-
lb
|
||
| TOTAL IMPLEMENTED | $248 | $9,180 |
$93
3,810
kWh
|
$155
-
kW-mo/yr
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs