ITAC Assessment: UL0156
ITAC logo
ITAC Assessment: UL0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Ice Making Machines
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 40,000
ft2
Annual Production 406
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,462 7,856,682
kWh
Electricity Demand $175,563 24,936
kW-mo/yr
Natural Gas $31,944 24,570
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,422 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $248

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $248 $9,180 $93
3,810
kWh
$155
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $997 $3,214 $365
14,361
kWh
$632
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $1,268 $100 $684
26,964
kWh
$584
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $694 $20 $379
14,947
kWh
$315
-
kW-mo/yr
- - -
05 2.7494: Install storm windows and doors $1,928 $2,000 $311
12,309
kWh
$196
-
kW-mo/yr
$1,421
-
MMBtu
- -
06 3.5221: Recycle casting sand $151 - - - - - $151
-
lb
07 3.1191: Change procedures / equipment / operating conditions $2,136 - - - - $2,136
-
gal
-
TOTAL RECOMMENDED $7,422 $14,514 $1,832
72,391
kWh
$1,882
-
kW-mo/yr
$1,421
-
MMBtu
$2,136
-
gal
$151
-
lb
TOTAL IMPLEMENTED $248 $9,180 $93
3,810
kWh
$155
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs