ITAC Assessment: UL0159
ITAC logo
ITAC Assessment: UL0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Air Filters
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 115,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 2,288
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,277 1,266,120
kWh
Electricity Demand $43,917 5,023
kW-mo/yr
Electricity Fees $512 -
Natural Gas $13,420 3,450
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,346 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $604 $1,240 $216
8,499
kWh
$388
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,030 $3,060 $405
15,826
kWh
$625
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $619 $87 $333
13,189
kWh
$286
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $746 $100 $365
14,361
kWh
$381
-
kW-mo/yr
-
05 3.5311: Recover and reuse waste material $205 - - - $205
-
lb
06 3.5316: Contract a wood pallet recycling company $6,900 - - - $6,900
-
lb
07 3.5248: Separate and recycle scrap metal to foundry or for sale $6,242 - - - $6,242
-
lb
TOTAL RECOMMENDED $16,346 $4,487 $1,319
51,875
kWh
$1,680
-
kW-mo/yr
$13,347
-
lb
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs