Assessment Year | 1996 |
---|---|
Principal Product | Air Filters |
NAICS |
n/a
|
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
115,000
ft2
|
Annual Production | 300,000
pieces
|
Production Hrs. Annual | 2,288
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $32,277 | 1,266,120 |
kWh
|
$0.025 |
Electricity Demand | $43,917 | 5,023 |
kW-mo/yr
|
$8.74 |
Electricity Fees | $512 | - |
|
- |
Natural Gas | $13,420 | 3,450 |
MMBtu
|
$3.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,346 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $604 | $1,240 |
$216
8,499
kWh
|
$388
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,030 | $3,060 |
$405
15,826
kWh
|
$625
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $619 | $87 |
$333
13,189
kWh
|
$286
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $746 | $100 |
$365
14,361
kWh
|
$381
-
kW-mo/yr
|
- | |
05 | 3.5311: Recover and reuse waste material | $205 | - | - | - |
$205
-
lb
|
|
06 | 3.5316: Contract a wood pallet recycling company | $6,900 | - | - | - |
$6,900
-
lb
|
|
07 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $6,242 | - | - | - |
$6,242
-
lb
|
|
TOTAL RECOMMENDED | $16,346 | $4,487 |
$1,319
51,875
kWh
|
$1,680
-
kW-mo/yr
|
$13,347
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs