ITAC Assessment: UL0157
ITAC logo
ITAC Assessment: UL0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Cooling Towers
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 200,000
ft2
Annual Production 3,400
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,547 5,136,870
kWh
Electricity Demand $98,610 10,832
kW-mo/yr
Natural Gas $84,663 22,367
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,719 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,049 $1,157 $682
26,964
kWh
$367
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $81 $2,160 $30
1,172
kWh
$51
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $951 $87 $502
19,637
kWh
$449
-
kW-mo/yr
- -
04 2.2437: Recover waste heat from equipment $330 $230 - - $330
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $553 $200 - - $553
-
MMBtu
-
06 3.5316: Contract a wood pallet recycling company $10,233 - - - - $10,233
-
lb
07 3.5248: Separate and recycle scrap metal to foundry or for sale $1,714 $600 - - - $1,714
-
lb
08 3.5248: Separate and recycle scrap metal to foundry or for sale $11,808 - - - - $11,808
-
lb
TOTAL RECOMMENDED $26,719 $4,434 $1,214
47,773
kWh
$867
-
kW-mo/yr
$883
-
MMBtu
$23,755
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs