Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,847

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0124 #05 Y:2018 Meter recycled water (to reduce sewer charges) $1,404 $405
WM0124 #04 Y:2018 Install vinyl strip / high speed / air curtain doors $1,472 $690
WM0124 #03 Y:2018 Lower temperature during the winter season and vice-versa $1,534 -
WM0124 #02 Y:2018 Pay utility bills on time $2,620 -
WM0124 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $16,040 $13,392
MI0337 #11 Y:2018 Eliminate or reduce compressed air usage $3,571 $6,578
MI0337 #10 Y:2018 Use optimum size and capacity equipment $3,724 $7,314
MI0337 #09 Y:2018 Reduce illumination to minimum necessary levels $4,557 $2,528
MI0337 #08 Y:2018 Install occupancy sensors $14,515 $19,215
MI0337 #07 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $15,813 $2,030
MI0337 #06 Y:2018 Clean or color roof to reduce solar load $21,780 $78,320
MI0337 #05 Y:2018 Utilize an evaporative air pre-cooler or other heat exchanger in ac system $24,458 $31,600
MI0337 #04 Y:2018 Insulate bare equipment $26,104 $3,000
MI0337 #03 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $31,197 $11,846
MI0337 #02 Y:2018 Lower temperature during the winter season and vice-versa $41,184 $480
MI0337 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $45,349 $76,979
IP0104 #07 Y:2018 Utilize higher efficiency lamps and/or ballasts $1,529 $4,887
IP0104 #06 Y:2018 Install compressor air intakes in coolest locations $1,678 $2,725
IP0104 #05 Y:2018 Install occupancy sensors $1,594 $475
IP0104 #04 Y:2018 Eliminate or reduce compressed air usage $22,395 $5,924