ITAC Assessment: IP0104
ITAC logo
ITAC Assessment: IP0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Anti-Vibration Product
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $100
M
to 500
M
# of Employees 275
Plant Area 375,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,011,200 18,503,200
kWh
Electricity Demand $635,141 36,631
kW-mo/yr
Electricity Fees $720 -
Natural Gas $341,724 77,159
MMBtu
TOTAL YEARLY COSTS $1,988,785
RECOMMENDED SAVINGS* $35,358 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,750

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7221: Lower temperature during the winter season and vice-versa $4,554 - $3,358
61,446
kWh
- $1,196
-
MMBtu
-
02 2.8112: Combine utility meters $2,606 - - - - $2,606
03 2.4322: Use or replace with energy efficient substitutes $1,002 - $699
12,794
kWh
$303
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $22,395 $5,924 $22,395
409,781
kWh
- - -
05 2.7135: Install occupancy sensors $1,594 $475 $1,594
29,159
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $1,678 $2,725 $1,137
20,800
kWh
$541
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,529 $4,887 $984
18,006
kWh
$545
-
kW-mo/yr
- -
TOTAL RECOMMENDED $35,358 $14,011 $30,167
551,986
kWh
$1,389
-
kW-mo/yr
$1,196
-
MMBtu
$2,606
TOTAL IMPLEMENTED $31,750 $14,011 $29,468
539,192
kWh
$1,086
-
kW-mo/yr
$1,196
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs