Assessment Year | 2022 |
---|---|
Principal Product | Treated Water |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $1 M to 5M |
# of Employees | 45 |
Plant Area |
958,320
ft2
|
Annual Production | 6,200,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $282,469 | 2,652,856 |
kWh
|
$0.11 |
Electricity Demand | $316,992 | 14,124 |
kW-mo/yr
|
$22.44 |
Natural Gas | $278,217 | 40,607 |
MMBtu
|
$6.85 |
TOTAL YEARLY COSTS | $877,678 | |||
RECOMMENDED SAVINGS* | $263,554 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $212,797 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $79,227 | $13,234 |
$61,476
577,237
kWh
|
$17,751
-
kW-mo/yr
|
- | |
02 | 2.4322: Use or replace with energy efficient substitutes | $38,848 | $11,000 |
$5,687
53,403
kWh
|
$25,673
-
kW-mo/yr
|
$7,488 | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $65,729 | $89,990 |
$54,119
508,161
kWh
|
$11,610
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,777 | $19,007 |
$6,777
63,630
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,909 | $34,177 |
$11,909
111,825
kWh
|
- | - | |
06 | 2.9114: Use solar heat to make electricty | $61,064 | $434,923 |
$61,064
573,367
kWh
|
- | - | |
TOTAL RECOMMENDED | $263,554 | $602,331 |
$201,032
1,887,623
kWh
|
$55,034
-
kW-mo/yr
|
$7,488 | ||
TOTAL IMPLEMENTED | $212,797 | $557,154 |
$183,436
1,722,395
kWh
|
$29,361
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs