ITAC Assessment: MI0337
ITAC logo
ITAC Assessment: MI0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Surgical Medical Devices
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 220,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $591,008 10,745,600
kWh
Electricity Demand $171,939 20,228
kW-mo/yr
Electricity Fees $140,560 -
TOTAL YEARLY COSTS $903,508
RECOMMENDED SAVINGS* $232,252 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $150,260

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $45,349 $76,979 $35,956
653,737
kWh
$9,393
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $41,184 $480 $32,752
595,496
kWh
$8,432
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $31,197 $11,846 $24,805
451,000
kWh
$6,392
-
kW-mo/yr
04 2.2511: Insulate bare equipment $26,104 $3,000 $20,757
377,405
kWh
$5,347
-
kW-mo/yr
05 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $24,458 $31,600 $20,182
366,939
kWh
$4,276
-
kW-mo/yr
06 2.7425: Clean or color roof to reduce solar load $21,780 $78,320 $9,680
176,000
kWh
$12,100
-
kW-mo/yr
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,813 $2,030 $13,042
237,121
kWh
$2,771
-
kW-mo/yr
08 2.7135: Install occupancy sensors $14,515 $19,215 $11,540
209,813
kWh
$2,975
-
kW-mo/yr
09 2.7111: Reduce illumination to minimum necessary levels $4,557 $2,528 $3,460
62,915
kWh
$1,097
-
kW-mo/yr
10 2.4323: Use optimum size and capacity equipment $3,724 $7,314 $3,069
55,808
kWh
$655
-
kW-mo/yr
11 2.4239: Eliminate or reduce compressed air usage $3,571 $6,578 $2,355
42,814
kWh
$1,216
-
kW-mo/yr
TOTAL RECOMMENDED $232,252 $239,890 $177,598
3,229,048
kWh
$54,654
-
kW-mo/yr
TOTAL IMPLEMENTED $150,260 $115,596 $119,471
2,172,194
kWh
$30,789
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs