ITAC Assessment: IP0046
ITAC logo
ITAC Assessment: IP0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Arial Lifts
NAICS 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 80,000
ft2
Annual Production 240
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,335 401,880
kWh
Electricity Demand $6,373 1,357
kW-mo/yr
Electricity Fees $2,690 -
Natural Gas $56,137 7,240
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4321: Upgrade obsolete equipment $1,665 $4 $1,213
20,875
kWh
$452
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,302 $64 $2,302
39,628
kWh
- -
03 2.4322: Use or replace with energy efficient substitutes $122 $117 $122
2,105
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,526 $4,032 $1,112
19,136
kWh
$414
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $348 $512 $348
5,997
kWh
- -
06 2.2533: Replace air curtain doors with solid doors $6,619 $10,141 - - $6,619
-
MMBtu
TOTAL RECOMMENDED $12,582 $14,870 $5,097
87,741
kWh
$866
-
kW-mo/yr
$6,619
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs