ITAC Assessment: MZ0319
ITAC logo
ITAC Assessment: MZ0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Non ferrous grounding products
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $10
M
to 50
M
# of Employees 12
Plant Area 63,420
ft2
Annual Production 6,700,000
pieces
Production Hrs. Annual 3,675
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $172,178 3,297,965
kWh
Electricity Demand $47,379 14,399
kW-mo/yr
Natural Gas $66,341 9,030
MMBtu
Waste Disposal Costs
Water Usage $2,586 304
Tgal
Water Disposal $4,600 262
Tgal
TOTAL YEARLY COSTS $293,084
RECOMMENDED SAVINGS* $58,918 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,583

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $687 $800 $570
10,966
kWh
$117
-
kW-mo/yr
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $5,278 $240 - - $5,278
-
MMBtu
03 2.1135: Repair furnaces and oven doors so that they seal efficiently $3,002 $600 - - $3,002
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $1,762 $4,140 $1,849
35,566
kWh
$(-87.0)
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $1,286 $480 $1,286
22,673
kWh
- -
06 2.7144: Install spectral reflectors / delamp $13,167 $45,756 $10,856
208,776
kWh
$2,311
-
kW-mo/yr
-
07 2.1321: Replace fossil fuel equipment with electrical equipment $22,855 $145,659 $(-7,928.0)
(-152,462)
kWh
$(-1,639.0)
-
kW-mo/yr
$32,422
-
MMBtu
08 2.2414: Use waste heat from hot flue gases to preheat $7,401 $25,720 - - $7,401
-
MMBtu
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,480 $3,480 $2,884
55,471
kWh
$596
-
kW-mo/yr
-
TOTAL RECOMMENDED $58,918 $226,875 $9,517
180,990
kWh
$1,298
-
kW-mo/yr
$48,103
-
MMBtu
TOTAL IMPLEMENTED $32,583 $77,736 $14,561
277,981
kWh
$2,341
-
kW-mo/yr
$15,681
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs