ITAC Assessment: KU0179
ITAC logo
ITAC Assessment: KU0179
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product TRANSFORMERS,INDUCTORS
NAICS
n/a
SIC 3677: Electronic Coils, Transformers, and Other Inductors
Sales Range $1
M
to 5
M
# of Employees 110
Plant Area
n/a
Annual Production 150,000
pieces
Production Hrs. Annual 2,168
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,358 352,579
kWh
Natural Gas $3,035 787
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,508 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,085

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $1,642 $500 $1,067
16,120
kWh
$575
-
MMBtu
02 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $1,693 $764 $446
6,741
kWh
$1,247
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $990 $1,450 $990
14,947
kWh
-
04 2.2515: Use optimum thickness insulation $730 $1,138 $834
12,603
kWh
$(-104.0)
-
MMBtu
05 2.2514: Cover open tanks $279 $60 $329
4,982
kWh
$(-50.0)
-
MMBtu
06 2.6121: Reduce hot water temperature to the minimum required $174 - - $174
-
MMBtu
TOTAL RECOMMENDED $5,508 $3,912 $3,666
55,393
kWh
$1,842
-
MMBtu
TOTAL IMPLEMENTED $3,085 $2,010 $2,386
36,049
kWh
$699
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings