ITAC Assessment: SD0300
ITAC logo
ITAC Assessment: SD0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Aluminum heat sinks
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 87
Plant Area 40
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 6,732
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,703 1,026,580
kWh
Electricity Demand $23,532 2,841
kW-mo/yr
Electricity Fees $1,446 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,370

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,870 $520 $15,817
139,113
kWh
$2,053
-
kW-mo/yr
- - - - -
02 2.4239: Eliminate or reduce compressed air usage $9,208 $20,000 $6,653
58,514
kWh
$2,555
-
kW-mo/yr
- - - - -
03 2.7134: Use photocell controls $8,501 $9,000 $5,596
49,218
kWh
$2,905
-
kW-mo/yr
- - - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,056 $14,800 $6,385
56,163
kWh
$671
-
kW-mo/yr
- - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,105 - $2,517
22,138
kWh
$588
-
kW-mo/yr
- - - - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,500 $10,000 - - - $5,500
-
lb
- - -
07 2.2628: Utilize a less expensive cooling method $11,000 - - - $11,000
-
gal
- - - -
08 3.2176: Increase use of automation $42,640 $20,000 - - - - $42,640 - -
09 3.2176: Increase use of automation $2,296 $3,500 - - - - - - $2,296
10 2.8123: Pay utility bills on time $426 - - - - - - $426 -
TOTAL RECOMMENDED $107,602 $77,820 $36,968
325,146
kWh
$8,772
-
kW-mo/yr
$11,000
-
gal
$5,500
-
lb
$42,640 $426 $2,296
TOTAL IMPLEMENTED $23,370 $10,520 $15,817
139,113
kWh
$2,053
-
kW-mo/yr
- $5,500
-
lb
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs