ITAC Assessment: SF0604
ITAC logo
ITAC Assessment: SF0604
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Surgical and Medical Instruments
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 350,000
ft2
Annual Production 23,500
units
Production Hrs. Annual 3,432
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $940,470 6,410,892
kWh
Electricity Demand $571,524 14,151
kW-mo/yr
Electricity Fees $6,299 -
Natural Gas $365,857 22,005
MMBtu
TOTAL YEARLY COSTS $1,884,150
RECOMMENDED SAVINGS* $129,543 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,457

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2625: Chill water to the highest temperature possible $33,778 $1,120 $24,521
167,151
kWh
$9,257
-
kW-mo/yr
-
02 2.7224: Reduce space conditioning during non-working hours $21,457 $280 $16,165
110,188
kWh
- $5,292
-
MMBtu
03 2.6231: Utilize controls to operate equipment only when needed $4,745 $1,883 $4,745
32,348
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $65,157 $47,904 $65,157
444,152
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,264 $2,879 $1,264
8,614
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,142 $8,611 $2,285
15,575
kWh
$857
-
kW-mo/yr
-
TOTAL RECOMMENDED $129,543 $62,677 $114,137
778,028
kWh
$10,114
-
kW-mo/yr
$5,292
-
MMBtu
TOTAL IMPLEMENTED $21,457 $280 $16,165
110,188
kWh
- $5,292
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs