| Assessment Year | 2013 |
|---|---|
| Principal Product | Pneumatic, Hydraulic and Electric actuators |
| NAICS | 333995: Fluid Power Cylinder and Actuator Manufacturing |
| SIC | 3593: Fluid Power Cylinders and Actuators |
| Sales Range | $50 M to 100M |
| # of Employees | 124 |
| Plant Area |
67,000
ft2
|
| Annual Production | 0
pieces
|
| Production Hrs. Annual | 2,760
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $141,924 | 2,769,000 |
kWh
|
$0.051 |
| Electricity Demand | $64,943 | 7,001 |
kW-mo/yr
|
$9.28 |
| Natural Gas | $7,580 | 840 |
MMBtu
|
$9.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $203,165 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $54,466 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $13,897 | - |
$13,897
201,408
kWh
|
- | - | - | |
| 02 | 2.6242: Minimize operation of equipment maintained in standby condition | $12,093 | - |
$12,093
174,000
kWh
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,058 | - |
$6,058
87,160
kWh
|
- | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,428 | - |
$1,084
15,600
kWh
|
$344
-
kW-mo/yr
|
- | - | |
| 05 | 2.6224: Schedule baking times of small and large components | $980 | - |
$980
14,100
kWh
|
- | - | - | |
| 06 | 4.112: Replace old machine with new automatic multi-station tool | $131,250 | $15,000 | - | - | - | $131,250 | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $3,449 | $1,081 |
$2,335
33,600
kWh
|
$1,114
-
kW-mo/yr
|
- | - | |
| 08 | 2.3212: Optimize plant power factor | $14,000 | $9,864 | - | - | $14,000 | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,010 | $27,442 |
$15,157
219,674
kWh
|
$4,853
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $203,165 | $53,387 |
$51,604
745,542
kWh
|
$6,311
-
kW-mo/yr
|
$14,000 | $131,250 | ||
| TOTAL IMPLEMENTED | $54,466 | $27,442 |
$49,269
711,942
kWh
|
$5,197
-
kW-mo/yr
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs