Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,105

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0479 #02 Y:2013 Replace electrically-operated equipment with fossil fuel equipment $67,610 $30,440
SD0479 #01 Y:2013 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $360,753 $1,272,000
WV0482 #16 Y:2013 Eliminate or reduce compressed air usage $507 $1,167
WV0482 #15 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $2,123 $5,400
WV0482 #14 Y:2013 Develop a repair/replace policy $3,427 $708
WV0482 #13 Y:2013 Reduce the pressure of compressed air to the minimum required $5,804 $200
WV0482 #12 Y:2013 Install occupancy sensors $6,231 $1,020
WV0482 #11 Y:2013 Install / repair insulation on steam lines $6,903 $1,632
WV0482 #10 Y:2013 Reduce excessive boiler blowdown $7,886 $8,000
WV0482 #09 Y:2013 Install outside air damper / economizer on hvac unit $8,132 $27,380
WV0482 #08 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $13,536 $9,000
WV0482 #07 Y:2013 Upgrade controls on compressors $17,822 $26,000
WV0482 #06 Y:2013 Utilize higher efficiency lamps and/or ballasts $31,791 $38,441
WV0482 #05 Y:2013 Analyze flue gas for proper air/fuel ratio $35,144 $1,000
WV0482 #04 Y:2013 Utilize higher efficiency lamps and/or ballasts $37,141 $51,865
WV0482 #03 Y:2013 Utilize energy-efficient belts and other improved mechanisms $37,833 -
WV0482 #02 Y:2013 Repair or replace steam traps $135,791 $7,100
WV0482 #01 Y:2013 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $177,357 $198,000
MZ0135 #09 Y:2013 Install compressor air intakes in coolest locations $552 $409
MZ0135 #08 Y:2013 Eliminate or reduce compressed air usage $688 $200