ITAC Assessment: WV0482
ITAC logo
ITAC Assessment: WV0482
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product plastic film
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 267,000
ft2
Annual Production 47,325,896
lb
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $826,655 25,644,600
kWh
Electricity Demand $679,947 45,477
kW-mo/yr
Fuel Oil #2 $1,528,429 65,328
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $527,428 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $287,866

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings
01 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $177,357 $198,000 $(-682.0)
(-21,155)
kWh
$(-434.0)
-
kW-mo/yr
$182,473
-
MMBtu
$(-4,000.0)
02 2.2113: Repair or replace steam traps $135,791 $7,100 - - $137,124
-
MMBtu
$(-1,333.0)
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $37,833 - $23,137
717,640
kWh
$14,696
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $37,141 $51,865 $21,593
669,766
kWh
$15,548
-
kW-mo/yr
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $35,144 $1,000 - - $35,264
-
MMBtu
$(-120.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $31,791 $38,441 $19,442
603,025
kWh
$12,349
-
kW-mo/yr
- -
07 2.4224: Upgrade controls on compressors $17,822 $26,000 $10,171
315,470
kWh
$7,651
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,536 $9,000 $8,274
256,628
kWh
$5,262
-
kW-mo/yr
- -
09 2.7241: Install outside air damper / economizer on hvac unit $8,132 $27,380 $8,132
252,248
kWh
- - -
10 2.1241: Reduce excessive boiler blowdown $7,886 $8,000 - - $7,886
-
MMBtu
-
11 2.2136: Install / repair insulation on steam lines $6,903 $1,632 - - $6,903
-
MMBtu
-
12 2.7135: Install occupancy sensors $6,231 $1,020 $3,809
118,141
kWh
$2,422
-
kW-mo/yr
- -
13 2.4231: Reduce the pressure of compressed air to the minimum required $5,804 $200 $3,547
110,017
kWh
$2,257
-
kW-mo/yr
- -
14 2.4151: Develop a repair/replace policy $3,427 $708 $2,833
87,876
kWh
$1,794
-
kW-mo/yr
- $(-1,200.0)
15 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,123 $5,400 $2,123
65,862
kWh
- - -
16 2.4239: Eliminate or reduce compressed air usage $507 $1,167 $313
9,698
kWh
$194
-
kW-mo/yr
- -
TOTAL RECOMMENDED $527,428 $376,913 $102,692
3,185,216
kWh
$61,739
-
kW-mo/yr
$369,650
-
MMBtu
$(-6,653.0)
TOTAL IMPLEMENTED $287,866 $137,113 $66,173
2,052,480
kWh
$45,055
-
kW-mo/yr
$179,291
-
MMBtu
$(-2,653.0)